TRANSPORT: Roads and Motorways | Bridges & Viaducts | Tunnels | Railways | Airports

 

 


TRANSPORT
RAILWAYS

Milan-Naples high speed railway line, Milan-Bologna section: Realization of two sections (total of approx. 40 km) in the provinces of Piacenza and Modena – Italy
Construction design of all civil works including viaducts, underpasses, overpasses, hydraulic works and auxiliary roads and buildings, as well as landscaping works.

 

Milan-Naples high speed railway line, Milan-Bologna section:  Works on the existing line in the municipality of Modena - Italy

Detailed design of works, including relocation of existing Milan-Bologna line, doubling of Modena-Mantua line and branch line for freight trains

 

Milan-Naples high speed railway line, Milan-Bologna section: Civil works for 18 km section (KP 45-63) - Italy

Detailed design of certain civil works, Including single and multi-span railway viaducts, of which one over 5 km long and four road underpasses

 

Al Zarqa-Traibil railway line (300 km) - Jordan

Technical - economic feasibility study of line, including maintenance, control, and signalling installations,  definition of track equipment and rolling stock.

 

Doubling of existing line Dammam-Hofuf-Al Kharj-Riyadh and direct line Hofuf-Riyadh (449 km), including stations, maintenance plants, signalling and telecommunications systems and ancillary works - Saudi Arabia

Feasibility study, surveys and investigations, preliminary and final design, environmental impact study, works supervision,  technical assistance

Upgrading and doubling of the Orte-Falconara Railway and branch line to the Adriatic line - Italy
Preliminary design and final design of the Jesi - Falconara section  (18,5 km). Preliminary design and environmental impact assessment study  of the branch line  (7.5 km)

New railway marshalling yard of Roja at Ventimiglia - Italy
Basic, preliminary and final designs and  environmental impact study for marshalling yard of 300,000m2 with 25 tracks

Integrated Transportation System for the development of the Kagera River Basin - Burundi, Rwanda, Tanzania, Uganda
Socio-economic study; traffic studies; preliminary design of the upgrading of existing railways, roads and port facilities; preliminary design of about 1,300 km. of new railway lines; cost-benefit feasibility study.

Upgrading and doubling of the Udine-Pontebba railway line (65 km) - Italy
Feasibility study and preliminary design (65 km); final design of 39-km section Udine-Carnia

Antisirabe - Fianarantsoa Railway Line - Madagascar
Final design of 242 km line including 5 km of bridges and viaducts and 17 km of tunnel
 

 

Home | About TECHNITAL | Projects | Special Projects | Contact Us

Copyright ©2004 Technital S.p.A.  -  All Rights Reserved. Site developed by Technital IT Division.

At Bong Shop Australia, we understand your needs for quality and style in your smoking experience. Discover the iconic mike tyson bong, designed for both functionality and flair. This unique piece not only delivers smooth hits but also showcases the legendary boxer’s signature touch. Elevate your sessions with this must-have accessory, perfect for enthusiasts seeking performance and aesthetic appeal.